Uploaded image for project: 'Jenkins'
  1. Jenkins
  2. JENKINS-12923

Deadlock if one of the triggered projects is deactivated

    • Icon: Bug Bug
    • Resolution: Fixed
    • Icon: Blocker Blocker
    • None
    • OS: Linux 64-bit
      Jenkins Version: 1.447
      Parameterized Trigger Plugin Version 2.13

      The "Trigger/call builds on other projects" build step locks the job if one of the "Projects to build" is deactivated.

      To reproduce:
      1. Add the "Trigger/call builds on other projects" to the build steps.
      2. Define some "Projects to build"
      3. Activate the check box "Block until the triggered projects finish their builds"
      4. Set "Mark this build as unstable if the triggered build is worse or equal to" to "UNSTABLE"
      5. Deactivate one of the projects configured in "Projects to build"
      6. Run the job

      Expected behaviour:
      The deactivated project will be ignored and the job continues with the next active project.

          [JENKINS-12923] Deadlock if one of the triggered projects is deactivated

          Hansgeorg Schwibbe created issue -
          Hansgeorg Schwibbe made changes -
          Assignee Original: Hansgeorg Schwibbe [ haschwib ] New: Kohsuke Kawaguchi [ kohsuke ]
          Hansgeorg Schwibbe made changes -
          Description Original: The "Trigger/call builds on other projects" build step locks the job if one of the "Projects to build" is deactivated.

          To reproduce:
          1. Add the "Trigger/call builds on other projects" to the build steps.
          2. Define some "Projects to build"
          3. Activate the check box "Block until the triggered projects finish their builds"
          4. Set "Mark this build as unstable if the triggered build is worse or equal to" to "UNSTABLE"
          5. Deactivate one of the projects configured in "Projects to build"
          6. Run the job

          Expected behaviour:
          The deactivated project will be ignored and the Job continues with the next active project
          New: The "Trigger/call builds on other projects" build step locks the job if one of the "Projects to build" is deactivated.

          To reproduce:
          1. Add the "Trigger/call builds on other projects" to the build steps.
          2. Define some "Projects to build"
          3. Activate the check box "Block until the triggered projects finish their builds"
          4. Set "Mark this build as unstable if the triggered build is worse or equal to" to "UNSTABLE"
          5. Deactivate one of the projects configured in "Projects to build"
          6. Run the job

          Expected behaviour:
          The deactivated project will be ignored and the job continues with the next active project.
          Hansgeorg Schwibbe made changes -
          Attachment New: screenshot-1.jpg [ 21570 ]
          Hansgeorg Schwibbe made changes -
          Summary Original: Job is locked if one of the triggered projects is deactivated New: Deadlock if one of the triggered projects is deactivated
          SCM/JIRA link daemon made changes -
          Resolution New: Fixed [ 1 ]
          Status Original: Open [ 1 ] New: Resolved [ 5 ]
          R. Tyler Croy made changes -
          Workflow Original: JNJira [ 143383 ] New: JNJira + In-Review [ 190528 ]

            kohsuke Kohsuke Kawaguchi
            haschwib Hansgeorg Schwibbe
            Votes:
            1 Vote for this issue
            Watchers:
            2 Start watching this issue

              Created:
              Updated:
              Resolved: