We are currently trying to lighten load on our perforce server, and one contributor to this load is jobs doing unnecessary force syncs.
I may be wrong (looked at the source and couldn't find anything that was doing this) but I seem to remember whenever a build fails it will trigger a "One time force sync" on the next build.
Perhaps this is a result of not being on the latest perforce plugin (we are on 1.3.18), or perhaps I am totally wrong and this never existed. If it does exist, I would like a way to configure it on/off on a per build basis.
Thanks for the great plugin and support!
[JENKINS-16529] Provide the ability to turn off one time force sync after a failed build
Resolution | New: Cannot Reproduce [ 5 ] | |
Status | Original: Open [ 1 ] | New: Resolved [ 5 ] |
Workflow | Original: JNJira [ 147352 ] | New: JNJira + In-Review [ 192355 ] |
Component/s | New: p4-plugin [ 19224 ] | |
Component/s | Original: perforce-plugin [ 15506 ] |