-
Improvement
-
Resolution: Fixed
-
Minor
-
-
5.0.0-beta2
I have a job A producing some reference warnings (the job is typically run only once).
Then i have a job B for which i want to substract the set of warnings created by job A before checking new warnings.
Is there currently a way to do this?
[JENKINS-20558] Add the possibility to ignore the list of base warnings from the build of another job
Labels | Original: reference warnings |
Workflow | Original: JNJira [ 152083 ] | New: JNJira + In-Review [ 178174 ] |
Labels | New: analysis-core-2.0 |
Epic Link |
New:
|
Resolution | New: Fixed [ 1 ] | |
Status | Original: Open [ 1 ] | New: Resolved [ 5 ] |
Status | Original: Resolved [ 5 ] | New: Fixed but Unreleased [ 10203 ] |
Released As | New: 5.0.0-beta2 | |
Status | Original: Fixed but Unreleased [ 10203 ] | New: Resolved [ 5 ] |