Uploaded image for project: 'Jenkins'
  1. Jenkins
  2. JENKINS-38958

If a job triggers more downstream builds in "Build" phase and the jobs are renamed, only the first job is renamed in the upstream project.

    XMLWordPrintable

    Details

    • Similar Issues:

      Description

      If a job triggers more downstream builds in "Build" phase and the jobs are renamed, only the first job is renamed in the upstream project.

      steps to reproduce:

      create job foo - content is indifferent
      create job bar - content is indifferent

      create job foobar with the following parameters
      in Build phase insert "trigger/call builds on other projects" to call foo
      add a new "trigger/call builds on other projects" to call bar
      save the project

      rename foo to foo2
      rename bar to bar2

      open the foobar project short info page (click the project from the list)
      it shows the following subprojects:
      static: foo2
      unresolved: bar (actual result)

      open job configuration screen (click to "configure"
      navigate to triggered projects,
      foo2 is ok
      bar project contains a "no such project "bar" ... warning (actual result)

      expected result: foobar contains call to bar2 (foo2 is contained wel)

        Attachments

          Activity

          georgefischhof George Fischhof created issue -

            People

            Assignee:
            Unassigned Unassigned
            Reporter:
            georgefischhof George Fischhof
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

              Dates

              Created:
              Updated: