-
Bug
-
Resolution: Unresolved
-
Major
-
None
multi-configuration jobs should not be triggered if its already known that they can not finish. This is for example the case if at least one node with a required label (aka tag) is disconnected.
[JENKINS-7306] start jobs only if all required labels/nodes are available
Component/s | New: matrix-project [ 18765 ] | |
Component/s | Original: matrix [ 15501 ] |
Workflow | Original: JNJira [ 137405 ] | New: JNJira + In-Review [ 174695 ] |