-
Improvement
-
Resolution: Unresolved
-
Major
-
None
-
Matrix project with several slaves as an axis.
A matrix project with n configurations and enabled Subversion tagging results in n+1 tags in Subversion.
How do I make a matrix project tag exactly one time (on success)?
I would propose introducing pre- and post-build steps that can be tied to the master job of a matrix project.