-
Improvement
-
Resolution: Fixed
-
Minor
-
None
Currently, when setting the build result using currentBuild.result, the stage does not reflect it when, in the Build History column, the build is correctly changed.
For example, if I want to set the build result to FAILURE when there are more than 2 tests failures, the build is correctly set to FAILURE but the build view does not show the stage nor the build as failed.
- duplicates
-
JENKINS-33700 Visualization color should not be green for an UNSTABLE build
- Closed
- links to