Build step that runs multiple jobs in parallel, and blocks until all are complete

      We would like to kick off multiple test jobs as build steps, and block waiting for them all to finish. Currently the execute serially. But we have lots of available resources to run them, so it would be so nice to run them in parallel, and get the results in 1 hour, rather than many.

          [JENKINS-12480] Build step that runs multiple jobs in parallel, and blocks until all are complete

          Marko Macek added a comment - - edited

          Currently, one can run parallel jobs when specifying them in a single build step/"Projects to build". But this requires them to have the same parameters (except factory ones).

          But when specifying multiple "Projects to build" within a single build step, there's no option "Block until the triggered projects finish their builds" that would wait for all jobs of this build step.

          I'll be trying "File Generator Parameter Factory" now.... Doesn't work for me, because in many cases I need to run different jobs.

          Marko Macek added a comment - - edited Currently, one can run parallel jobs when specifying them in a single build step/"Projects to build". But this requires them to have the same parameters (except factory ones). But when specifying multiple "Projects to build" within a single build step, there's no option "Block until the triggered projects finish their builds" that would wait for all jobs of this build step. I'll be trying "File Generator Parameter Factory" now.... Doesn't work for me, because in many cases I need to run different jobs.

          ikedam added a comment -

          I get this ticket is a request of a new feature as described by Marco.
          If not, please let me know what the real problem is. and update the description.

          ikedam added a comment - I get this ticket is a request of a new feature as described by Marco. If not, please let me know what the real problem is. and update the description.

          I have the same issue as Marko. As a work-around, I'm using the Multijob Plugin [1] now, but that has other issues [2].

          [1] https://wiki.jenkins-ci.org/display/JENKINS/Multijob+Plugin
          [2] https://issues.jenkins-ci.org/browse/JENKINS-25636

          Sebastian Schuberth added a comment - I have the same issue as Marko. As a work-around, I'm using the Multijob Plugin [1] now, but that has other issues [2] . [1] https://wiki.jenkins-ci.org/display/JENKINS/Multijob+Plugin [2] https://issues.jenkins-ci.org/browse/JENKINS-25636

          Kunal W added a comment -

          We have to mention all the jobs in one step.
          Add all the jobs, separated by comma, in "Projects to build".
          Then check "Block until the triggered projects finish their builds"

          Works for me.

          Kunal W added a comment - We have to mention all the jobs in one step. Add all the jobs, separated by comma, in "Projects to build". Then check "Block until the triggered projects finish their builds" Works for me.

          Kunal W added a comment -

          Check the attached screenshot and configure the job.

          Kunal W added a comment - Check the attached screenshot and configure the job.

          Which version do you use to trigger multiple jobs in parallel ? We are using 2.35.2 and this is no possible. All jobs start in sequence.

          zdravko branzov added a comment - Which version do you use to trigger multiple jobs in parallel ? We are using 2.35.2 and this is no possible. All jobs start in sequence.

          in 2.35.2 it does not run jobs in parallel

          zdravko branzov added a comment - in 2.35.2  it does not run jobs in parallel

          Kunal W added a comment -

          2.32

          I have uploaded a screenshot of how I have configured it

          Kunal W added a comment - 2.32 I have uploaded a screenshot of how I have configured it

          If I have two different parameters to be passed for two different jobs, how can I achieve this?

          For example, I have two jobs to be triggered in parallel and both the jobs  have two different parameters to be passed, I have used "Predefined parameters", but I assume how jenkins will take the parameters for the two jobs?

          Anil Thatavarthi added a comment - If I have two different parameters to be passed for two different jobs, how can I achieve this? For example, I have two jobs to be triggered in parallel and both the jobs  have two different parameters to be passed, I have used "Predefined parameters", but I assume how jenkins will take the parameters for the two jobs?

          Please check if you have enough build processors active/free for multi-builds

          Andreas Welter added a comment - Please check if you have enough build processors active/free for multi-builds