-
New Feature
-
Resolution: Unresolved
-
Minor
-
None
Our project has a job A which has four downstream jobs (A1, A2, A3 and A4).
For a particular delivery pipeline view we are only interested in A, A1, and A2. Thus I would like to mark both A3 and A4 as "final Job" of my pipeline. This is currently not possible, the field only takes one entry.
Unfortunately, this is a lot more effort than one would hope as it requires a lot of refactoring to swap out the single last job configuration to multiple ones. Not realistic that it will be addressed any time soon.