-
Improvement
-
Resolution: Unresolved
-
Minor
-
None
It should be possible to use a build parameter as the value for "Maximum Total Concurrent Builds" and "Maximum Concurrent Builds Per Node".
Then it would be possible to trigger builds from different jobs with different max. builds values.