10s is not long enough to abort job

This issue is archived. You can view it, but you can't modify it. Learn more

      When aborting a pipeline, it tries for 10 seconds then starts going down the path of killing everything in sight.  It would be much better if there was a way to tell Jenkins that job abort takes longer than 10 seconds on a per job basis and be able to set a global upper limit on how long jobs may defer.
       

            Assignee:
            Unassigned
            Reporter:
            Allen Wittenauer
            Archiver:
            Jenkins Service Account

              Created:
              Updated:
              Resolved:
              Archived: