Matrix sub jobs do not keep n+1 builds, when n is specified.

XMLWordPrintable

      I have a matrix job with the setting to only keep 3 builds (no limit on number of days).
      The main matrix job keeps 3, but if you open the matrix sub jobs, each is keeping 4 jobs.

            Assignee:
            Unassigned
            Reporter:
            markjwolff
            Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

              Created:
              Updated: