'SCM Timer Trigger Slicer' show wrong schedules for MultiJob Project

XMLWordPrintable

      I have a MultiJob Project which has a "Build periodically" schedule plan. This information is not correctly visualized in the "SCM Timer Trigger Slicer" overview. In the overview the job is shown with "Configured Value" = "(Disabled)".

            Assignee:
            mdonohue
            Reporter:
            Stefan Fattinger
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

              Created:
              Updated:
              Resolved: