• Icon: Bug Bug
    • Resolution: Cannot Reproduce
    • Icon: Major Major
    • build-pipeline-plugin
    • Jenkins ver. 1.596.2
      Webbrowser: Chrome and Internet Explorer

      We have implemented jenkins pipelines. It has several builds chained together. The second to last build triggers three parellel jobs if the build suceeds. Two of these jobs fail but the result of the builds are shown as success.

      I've included two screen shots. One showing the build pipeline as green but the seperate builds are red. The build logs also report the build is failed.

          [JENKINS-31859] Jenkins pipeline displaying wrong result

          R. Tyler Croy added a comment -

          I've moved this to the JENKINS project, the WEBSITE project is for tickets pertaining to the jenkins-ci.org website

          R. Tyler Croy added a comment - I've moved this to the JENKINS project, the WEBSITE project is for tickets pertaining to the jenkins-ci.org website

          josipj What version are you using?

          Manuel Recena Soto added a comment - josipj What version are you using?

          Josip Juric added a comment -

          We're using jenkins version 1.596.2

          Josip Juric added a comment - We're using jenkins version 1.596.2

          josipj I meant plugin version.

          Manuel Recena Soto added a comment - josipj I meant plugin version.

          Josip Juric added a comment -

          The build pipeline plugin version we are using is 1.4.7

          Josip Juric added a comment - The build pipeline plugin version we are using is 1.4.7

          josipj It would be interesting to try if 1.4.9 version solves the problem.

          Manuel Recena Soto added a comment - josipj It would be interesting to try if 1.4.9 version solves the problem.

          Dan Alvizu added a comment -

          There were issues in upstream/downstream relationship between 1.4.7 and 1.4.9 - please upgrade and re-test.

          I have this exact scenario and cannot reproduce.

          If you are able to reproduce, please include more information about your setup:

          How does the second job trigger the three jobs? If you can include the config.xml that would be great, but barring that:

          1) Are you using 'build other projects', 'manual trigger', 'trigger paramterized projects', and if so what version of the parameterized tirgger plugin are you running?
          2) What are you doing in the jobs which are failing yet show up as success? Can you include the config.xml of those jobs?

          Dan Alvizu added a comment - There were issues in upstream/downstream relationship between 1.4.7 and 1.4.9 - please upgrade and re-test. I have this exact scenario and cannot reproduce. If you are able to reproduce, please include more information about your setup: How does the second job trigger the three jobs? If you can include the config.xml that would be great, but barring that: 1) Are you using 'build other projects', 'manual trigger', 'trigger paramterized projects', and if so what version of the parameterized tirgger plugin are you running? 2) What are you doing in the jobs which are failing yet show up as success? Can you include the config.xml of those jobs?

            recena Manuel Recena Soto
            josipj Josip Juric
            Votes:
            0 Vote for this issue
            Watchers:
            3 Start watching this issue

              Created:
              Updated:
              Resolved: