-
Improvement
-
Resolution: Duplicate
-
Minor
-
None
The application consists of two major parts, each of them built using a separate pipeline.
To track the overall status and start both pipelines simultaneously they are called from a top level pipeline (also responsible for notifications ...) using "build job:"
I would be nice to be able to jump directly to the respective run for the two pipelines from the top level job by clicking on the tasks in the stage (in the following example "Part 1" or "Part 2" in the "Build" stage).
.
- duplicates
-
JENKINS-38339 UI for downstream jobs launched with 'build' step
- In Review