Directly jump to sub jobs started from a pipeline

XMLWordPrintable

    • Type: Improvement
    • Resolution: Duplicate
    • Priority: Minor
    • Component/s: blueocean-plugin
    • None

      The application consists of two major parts, each of them built using a separate pipeline.

      To track the overall status and start both pipelines simultaneously they are called from a top level pipeline (also responsible for notificationsĀ ...) using "build job:"

      I would be nice to be able to jump directly to the respective run for the two pipelines from the top level job by clicking on theĀ tasks in the stage (in the following example "Part 1" or "Part 2" in the "Build" stage).

      .

      Ā 

        1. pipe.PNG
          4 kB
          Christian Kerth

            Assignee:
            Unassigned
            Reporter:
            Christian Kerth
            Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

              Created:
              Updated:
              Resolved: